|

June 2008 - Up the
Stairs |
|
|

June 2008 - Down
the Stairs |
|
|

June 2008 - Landing at the top of the Stairs |
|
|

June 2008 - The Landing
|
|
|

June 2008 - The Landing
|
|
|

June 2008 - The Insulation-free airing cupboard |
|
|

June 2008 - Looking down the corridor to the
Master Bed |
|
|

June 2008 - View from the bathroom |
|
|

June 2008 - Looking out towards Totteridge House |
|
|

June 2008 - Looking the other way |
|
|

Saturday 14th June - Immersion Tank Pipes lagged |
|
|

Saturday 14th June - Immersion Tank Jacket |
|
|

Saturday 14th June - Jacket on the Immersion
Tank |
|
|

Tuesday 17th June - Super-insulated Loft Hatch |
|
|

Tuesday 17th June - Just cut a slightly larger
hole.... |
|
|

Tuesday 17th June - Just don't cut any joists! |
|
|

Tuesday 17th June - Attach Super-insulated Loft
Hatch |
|
|

Tuesday 17th June - New Super-insulated Loft
Hatch |
|
|

Tuesday 17th June - New Super-insulated Loft
Hatch |
|
|

20 |
|
|
20) 14th April 2010 - The old domestic hot water
cylinder is stripped out of the Airing Cupboard. |
|

21 |
|
|

22 |
|
|

23 |
|
|

24 |
|
|
21) Empty airing cupboard. 22) The new
Gledhill twin coil tank is 170 litres as opposed to the
old 100 litre capacity tank. It will use heat from the
Solar Thermal Panels to heat the hot water.
22) The new Tank all plumbed in.
23) 15th April 2010 - All the pipes were
insulated by Mark. He also replaced the Airing Cupboard
shelves. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|