|

June 2008 - Milla
in the lounge |
|
|

June 2008 -
Ever-present Milla in the lounge |
|
|

June 2008 - Looking towards the Conservatory at
the back |
|
|

June 2008 - Milla in the entry Hall |
|
|

June 2008 - Milla shows us the downstairs Cloak
Room |
|
|

June 2008 - Entry hallway and front door |
|
|

June 2008 - Milla does it like a boy! |
|
|

June 2008 - Top of the toilet
|
|
|

June 2008 - More toilet - yuk - ghastly green |
|
|

June 2008 - Milla watches Daddy take another
photo |
|
|

June 2008 - Milla deep in thought |
|
|

June 2008 - Looking towards the TV |
|
|

June 2008 - Looking the other way towards
Conservatory |
|
|

June 2008 - Fire Place
|
|
|

June 2008 - Fire Place
|
|
|

June 2008 - Milla watching "Over The Hedge" |
|
|

June 2008 - View from the Conservatory |
|
|

June 2008 - Liya stuffs freshly washed Cushion
Covers |
|
|

June 2008 - View of the Stairs and Hallway |
|
|

June 2008 - Relation of Stairs to Kitchen |
|
|

June 2008 - Stairs & Hallway
|
|
|

June 2008 - Liya still stuffing...
|
|
|

June 2008 - View through hall door |
|
|

June 2008 - Behind the TV after the Sky man had
been... |
|
|

August 2008 - The new Room Thermostat installed |
|
|

August 2008 - A new Thermostatic Radiator valve |
|
|

April 2009 - the new Dovre 250 wood-burning
stove |
|
|

July 2009 - the Stove with its shelf and all
decorating done |
|
|

1 |
|
|

2 |
|
|

3 |
|
|

4 |
|
|
1) Tuesday 11th August - the downstairs toilet
gets a new white corner washbasin. Those very-dated
tiles need to go.... 2)
The Toilet was replaced too. Remember the old green one?
Horrid! This is a Twyford Interflush water-saving
toilet. Coolest toilet ever! Note that the old toilet
was much bigger so it left a bit of a mess at the back
where there is no paint behind the cistern.
3 & 4) Pictured Wednesday the 19th August these
photo's of the dowstairs loo show the new splashback
tiles going in around the sink. These are leftover tiles
from the Kitchen walls and were skillfully tiled here by
Mark. |
|

5 |
|
|

6 |
|
|

7 |
|
|
|
5) Monday 31st August - the tiling and repainting
in the downstairs loo is complete. Here are the new
tiles all grouted and sealed up. 6) Here is the
toilet with the area behind filled, sanded and painted.
7) In connection wih the install of the KWB
Easyfire Wood Pellet Boiler in the garage; we now have
yet another new Thermostat in the Lounge stair-well. It
is in a somewhat less-than-suitable metallic-grey
plastic. It has several knobs and buttons to keep Milla
amused as it is within her arms reach. We see trouble
ahead. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|