June 2008 -
Recessed ceiling lights |
|
|

June 2008 - Bees
nest number one |
|
|

June 2008 - Bees nest number two |
|
|

June 2008 - Bees nest number three |
|
|

June 2008 - what a mess, but no birds nest |
|
|

June 2008 - A few dangerous planks of wood |
|
|

June 2008 - Bees nest number four |
|
|

June 2008 - Bees nest number five |
|
|

June 2008 - Bees Nest number six |
|
|

June 2008 - Bees nest number seven |
|
|

June 2008 - Uncovered & uninsulated header tank
1 |
|
|

June 2008 - 50 Gallon Water Tank part-covered |
|
|

June 2008 - Header Tank Insulation ripped up |
|
|

June 2008 - TV Aerial on a box |
|
|

June 2008 - Recessed Ceiling lights in 100mm
insulation |
|
|

June 2008 - Shower Pumps on a tea tray |
|
|

June 2008 - Why photo the attic anyway? |
|
|

June 2008 - ...because it needs the most work! |
|
|

June 2008 - We will insulate the pipes, tanks &
floor |
|
|

June 2008 - 100mm Mineral Wool Insulation is not
enough |
|
|

June 2008 - Another 200mm of sheep's wool will
go on top |
|
|

June 2008 - New joists will go in and the loft
part-boarded |
|
|

June 2008 - These uninsulated pipes run from the
Boiler |
|
|

June 2008 - All these odd-sized boards must go |
|
|

June 2008 - Odd sized boards are dangerous! |
|
|

June 2008 - The Loft Hatch will also be replaced |
|
|

June 2008 - The Attic - what a freakin mess! |
|
|

Sunday 15th June - New Tank Lids & Insulation
Jackets |
|
|

Sunday June 15th - Heating Header Tank -no lid |
|
|

Sunday June 15th - Tank Lid added |
|
|

Sunday 15th June - Insulation wrap added |
|
|

Sunday 15th June - Hot Water Header Tank with
new lid |
|
|

Sunday June 15th - Tank fitted with Insulation
Jacket |
|
|

Sunday 15th June - New lights fitted to the
Attic |
|
|

Sunday June 15th - New lights and a big tidy up |
|
|

Wednesday 2nd July - the Black Mountain Sheeps
Wool |
|
|

Friday 11th July - boxing in the recessed
ceiling lights |
|
|

Friday 11th July - the sheeps wool insulation
laid out |
|
|

Friday 11th July - the first layer laid |
|
|

Sunday 13th July - joists and flooring going in
place |
|
|

August 31st - Work moves on to the centre section |
|
|

August 31st - The new flooring goes down, note loft
hatch! |
|
|

43 |
|
|

44 |
|
|
43 & 44) 7th & 10th April 2010 - the Inverter
goes into the attic so that the Photovoltaics can be
grid linked. It converts the solar panel DC (direct
current) to AC (alternating current) at mains voltage
240V AC. The Inverter reads 2.027Kw - more than enough
to boil a couple of kettles! It is sunny out side. |
|

45 |
|
|

46 |
|
|

47 |
|
|

48 |
|
|
45) Viw of the new inverter placed on the western
wall of the attic. 46) The Photovoltaic wiring
goes through this white PVC conduit.
47) The armoured cable from the inverter goes
down to the main house fuseboard via the outside wall
behind a downpipe.
48) On the opposite wall is the pump for the
Solar Thermal panels. |
|

49 |
|
|

50 |
|
|

51 |
|
|

52 |
|
|
49) Here you can see the pipes from the pump going
out to the roof where the evacuated tubes are. 50,
51 & 52) 12th May 2010 - a fresh view of the attic
after the dust has settled from the Solar Panel
installation. Views show the over-boarding underfoot and
the items stored on top. Most storage to the sides is
used with the central area largely clear apart from the
area under the Photovoltiac Inverter on the wall.
Everything is reasonably neat and tidy. |
|

53 |
|
|

54 |
|
|

55 |
|
|

56 |
|
|
53, 54, 55 & 56)
12th May 2010 - more attic views showing loft hatch and
water tank. |
|

57 |
|
|
|
|
|
57) 12th May 2010 - final attic shot for now. The
only reason to come back up here for any period of time
may be to fit further insulation at some point in the
future. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|