New Krofire House - Attic

 
 

Home | Gallery 2000 | Gallery 2001 | Gallery 2002 | Gallery 2003 | Gallery 2004 | Gallery 2005 | Kazakhstan 2005 | Gallery 2006 | Gallery 2007 | Switzerland 2007 | Gallery 2008 | Gallery 2009 Early | Gallery 2009 Late | Gallery 2010 Early | Gallery 2010 Late | Baby Pictures | Our Wedding | New Krofire House | Old Krofire House

 
 

Milla's 4th Birthday Party - photos now here...

 

Lounge
Kitchen
Stairs & Landing
Bathroom
Master Bedroom
Bed 2 - Milla
Bed 3 - Yana
Bed 4 - Study
Mark's Study
Garage
Attic
Garden

Gallery 2000
Gallery 2001
Our Wedding
Gallery 2002
Gallery 2003
Gallery 2004
Gallery 2005
Kazakhstan 2005
Gallery 2006
Gallery 2007
Switzerland 2007
Gallery 2008
Gallery 2009 early
Gallery 2009 late
Gallery 2010 early
Gallery 2010 late
Center Parcs 2009
Baby Pictures
New Krofire House
Old Krofire House

  

 

June 2008 - Recessed ceiling lights

June 2008 - Bees nest number one

June 2008 - Bees nest number two

June 2008 - Bees nest number three

June 2008 - what a mess, but no birds nest

June 2008 - A few dangerous planks of wood

June 2008 - Bees nest number four

June 2008 - Bees nest number five

June 2008 - Bees Nest number six

June 2008 - Bees nest number seven

June 2008 - Uncovered & uninsulated header tank 1

June 2008 - 50 Gallon Water Tank part-covered

June 2008 - Header Tank Insulation ripped up

June 2008 - TV Aerial on a box

June 2008 - Recessed Ceiling lights in 100mm insulation

June 2008 - Shower Pumps on a tea tray

June 2008 - Why photo the attic anyway?

June 2008 - ...because it needs the most work!

June 2008 - We will insulate the pipes, tanks & floor

June 2008 - 100mm Mineral Wool Insulation is not enough

June 2008 - Another 200mm of sheep's wool will go on top

June 2008 - New joists will go in and the loft part-boarded

June 2008 - These uninsulated pipes run from the Boiler

June 2008 - All these odd-sized boards must go

June 2008 - Odd sized boards are dangerous!

June 2008 - The Loft Hatch will also be replaced

June 2008 - The Attic - what a freakin mess!

Sunday 15th June - New Tank Lids & Insulation Jackets

Sunday June 15th - Heating Header Tank -no lid

Sunday June 15th - Tank Lid added

Sunday 15th June - Insulation wrap added

Sunday 15th June - Hot Water Header Tank with new lid

Sunday June 15th - Tank fitted with Insulation Jacket

Sunday 15th June - New lights fitted to the Attic

Sunday June 15th - New lights and a big tidy up

Wednesday 2nd July - the Black Mountain Sheeps Wool

Friday 11th July - boxing in the recessed ceiling lights

Friday 11th July - the sheeps wool insulation laid out

Friday 11th July - the first layer laid

Sunday 13th July - joists and flooring going in place

August 31st - Work moves on to the centre section

August 31st - The new flooring goes down, note loft hatch!

43

44

43 & 44) 7th & 10th April 2010 - the Inverter goes into the attic so that the Photovoltaics can be grid linked. It converts the solar panel DC (direct current) to AC (alternating current) at mains voltage 240V AC. The Inverter reads 2.027Kw - more than enough to boil a couple of kettles! It is sunny out side.

45

46

47

48

45) Viw of the new inverter placed on the western wall of the attic.

46) The Photovoltaic wiring goes through this white PVC conduit.

47) The armoured cable from the inverter goes down to the main house fuseboard via the outside wall behind a downpipe.

48) On the opposite wall is the pump for the Solar Thermal panels.

49

50

51

52

49) Here you can see the pipes from the pump going out to the roof where the evacuated tubes are.

50, 51 & 52) 12th May 2010 - a fresh view of the attic after the dust has settled from the Solar Panel installation. Views show the over-boarding underfoot and the items stored on top. Most storage to the sides is used with the central area largely clear apart from the area under the Photovoltiac Inverter on the wall. Everything is reasonably neat and tidy.

53

54

55

56

53, 54, 55 & 56) 12th May 2010 - more attic views showing loft hatch and water tank.

57

 

58

 

59

 

60

57) 12th May 2010 - final attic shot for now. The only reason to come back up here for any period of time may be to fit further insulation at some point in the future.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Meet the family:

Milla

  

Yana

Mum

Dad

 

Milla's Art:

 

 

 

 

 

 

 

 
 

Gallery 2000 | Gallery 2001 | Our Wedding | Gallery 2002 | Gallery 2003 | Gallery 2004 | Gallery 2005 | Kazakhstan 2005 | Gallery 2006 | Gallery 2007 | Switzerland 2007 | Gallery 2008 | Gallery 2009 early | Gallery 2009 late | Gallery 2010 early | Gallery 2010 late | Center Parcs 2009 | Baby Pictures | New Krofire House | Old Krofire House

Lounge | Kitchen | Stairs & Landing | Bathroom | Master Bedroom | Bed 2 - Milla | Bed 3 - Yana | Bed 4 - Study | Mark's Study | Garage | Attic | Garden

 

  You can E:Mail us directly by clicking

 

 
Sponsored by Krofire Enterprises Ltd

This Family

     
 

www.transition-wycombe.org.uk